News

  • All articles
  • 10mm
  • 7mm
  • before after
  • choosing
  • comparison
  • DIY
  • epoxy
  • flooring
  • garage
  • garage flooring
  • garage makeover
  • guide
  • how-to
  • ideas
  • inspiration
  • installation
  • maintenance
  • t-joint
  • tips
  • x-joint

News

How to Install Interlocking Garage Floor Tiles: Complete DIY Guide

Garage Flooring UK.Feb 21, 2026
Installing interlocking PVC garage floor tiles is one of the easiest home improvement projects you can tackle. Here's our step-by-step guide to getting a professional result every time. Before You Start Our interlocking tiles can be installed over any hard, flat surface — concrete, screed, existing vinyl, or even painted floors. The subfloor doesn't need to be perfect; our tiles accommodate minor imperfections up to 3mm. You'll need: Tape measure, rubber mallet (optional), Stanley knife or jigsaw, straight edge, and a clean broom. Step 1: Clean & Prepare Give the floor a thorough sweep to remove dust, debris, and loose material. If there are any significant bumps or protruding nails, knock them flat. You don't need to degrease or treat the surface — the tiles sit on top without adhesive. Step 2: Measure & Plan Measure your garage and calculate how many tiles you need. Our tiles are 500mm x 500mm (0.25m² each). Add 5% extra for cuts and waste. Plan your layout from the most visible point — usually the garage door — working backwards. Step 3: Start Laying Place your first tile in the corner with the interlocking lugs facing away from the walls. Leave a 5mm expansion gap between the tiles and walls. Press the next tile's loops over the lugs until you hear a satisfying click. That's it — no glue, no tools. Step 4: Build Row by Row Continue clicking tiles together row by row. For a T-joint (brick) pattern, offset each row by half a tile — this creates a stronger floor. For an X-joint (grid) pattern, align tiles in a uniform grid for a clean, symmetrical look. Step 5: Cutting Edge Tiles For edges, measure the gap, mark the tile, and cut with a Stanley knife and straight edge (7mm tiles) or jigsaw (10mm tiles). PVC cuts cleanly and easily. Step 6: Finish with Ramp Edges Click ramp edges onto any exposed tile edges at doorways and transitions. These provide a smooth, trip-free slope and a professional finish. ⏱️ How Long Will It Take? Single garage (15m²): 2–3 hours | Double garage (30m²): 4–5 hours | Large workshop (50m²+): 6–8 hours Pro Tips Let tiles acclimatise indoors for 24 hours if your garage is heated Work with a partner for large areas — one person clicks, one carries A rubber mallet helps in cold weather when PVC is slightly stiffer Take a photo of your finished floor — you'll want to show it off! Shop Floor Tiles Shop Ramp Edges